NOTICE
ROAD MAINTENANCE WORK
As part of the
Hopkinton DPW’s continuing effort to
perform cost-effective street
maintenance, crack sealing operations
will be performed beginning on Monday
October 16th.
Crack sealing is an essential
aspect of good pavement management
program as this process protects
against premature aging of asphalt
pavements by preventing water
infiltration into existing pavement
cracks.
The following
street sections are scheduled for
crack sealing:
Monday Oct 16th
West Main St (School St to
Upton Town Line)
Tuesday Oct 17th
Saddle Hill Rd (Stoney Brook Rd
to Daniel Shay Rd)
Wed-Fri Oct 18-20th
Colburn, Hopkins &
Valentine Rds
This year the
Town, through use of an outside
contractor will be utilizing a
slightly different method of
performing this work.
The method to be implemented is
known as the Mulch Seal Crack Healing
process.
With this process, residents
will notice a fine mixture of organic
and stone sand is applied over the
cracks that are sealed.
This mixture is meant to
prevent the crack seal material from
tracking prior to curing and will also
prevent material from adhering to
vehicles.
This will result in a somewhat
unsightly appearance on the roadway
for a couple of days until the organic
material dissipates. Should, after
passing over these roads you find
material on your vehicle, simply rinse
it off with a garden hose.
Hopkinton DPW
believes that utilization of the
method described will result in both
short and long-term pavement
maintenance savings.
The process eliminates the
“washboard” effect of conventional
crack sealing. We request your
patience during the brief period while
the mulch material is spread on the
roadway. |